Best & Worst Practices Please!

Julia Evans, BSRIA Chief Executive

Julia Evans, BSRIA Chief Executive

BSRIA recently held a workshop on behalf of DECC identifying priorities to promote low carbon heating and cooling in non-domestic buildings as part of the development of its low carbon heat strategy.  Attendees were drawn from both the Young Engineers and Energy and Sustainability BSRIA networks.  Personal thanks to AECOM’s Ant Wilson for chairing the event.

It was a busy day.  It recognised that both new and existing buildings have a pivotal role in reducing greenhouse gas emissions, and by 2050 one of the key requirements will continue to be how we provide heating and cooling.

BSRIA’s Peter Tse and Ian Orme both gave excellent presentations which drew on both good and poor practices identified from more than 50 independently assessed case studies.  These, I felt, answered the questions “what does good practice look like”, as well as “what are the consequences when its not followed”.

The workshop session resulted in many suggestions as to priorities for the future.  There were a couple which caught my eye.

In response to the suggestion that one of the priorities for DECC should be identifying independently assessed best practice and developing exemplars of new technologies, a number of delegates felt that instances of “bad practice” were even more helpful.  It seemed to me that a priority for at least a part of the audience was to know what to avoid doing.  Perhaps this reflects the industry’s receptiveness to messages about risk, and that we often learn most when we make mistakes.  The emphasis on “independent assessment” also resonated.  Many have become sceptical about instances of self-identified “best practice”, and BSRIA’s independent guidance on what works, and what does not, is there to assist the industry do things better.

Another of the workshop themes was on “skills shortages”.  After many years of recession, construction companies have euphemistically “right sized”, and this means that we have lost a lot of great talent from the industry.  Now that there are green shoots of recovery in construction, there is already talk of an exacerbated “skills gap”.  This gap makes it even more challenging for the industry to deliver buildings which meet the needs of their occupiers and where innovation is required to help tackle climate change, and meet the UK’s commitment to “zero carbon” and “very low energy” buildings. This reminded me of another of BSRIA’s strengths – training provision.

BSRIA's 2014/15 Training Brochure

BSRIA’s 2014/15 Training Brochure

Finally there was an astute observation that our recent quest for low carbon buildings has meant that we have worried less about the efficient use of energy, with the net outcome that we can end up with an EPC A rating for carbon design, but a DEC G rating for energy in use.  The move to policies that move us to buildings which are both zero carbon and nearly zero energy use will hopefully remedy this, although I suspect this particular journey may contain further unintended consequences before we reach that goal.

The workshop identified many requirements if we are to create environmentally conscious buildings that meet user needs, and importantly maintain these elements over the life of the building.

BSRIA’s mission remains to “make buildings better”.  As part of my role, I’m listening to our members and the industry what they expect from BSRIA.  I’d like to extend this offer to you, so if you have ideas about BSRIA’s future role, please send them to me: Julia.evans@bsria.co.uk.

To learn more about the BSRIA workshop you can download all the presentations from our website. 

The “Seven pillars of (BIM) wisdom”

In 2011 the report for the Government Construction Client Group defined Level 2 BIM as being:

“Managed 3D environment held in separate discipline “BIM” tools with attached data….”

However, as a consequence of ongoing development of the processes and tools available, and feedback from early adopter projects and other industry experience, the Government has recently refined its definition of Level 2 BIM as having the following seven components:

  1. PAS 1192-2:2013 is available to download for free from BSI

    PAS 1192-2:2013 is available to download for free from BSI

    PAS 1192-2:2013 Specification for information management for the capital/delivery phase of assets using buildinginformation modelling

  2. PAS 1192-3:2014 Specification for information management for the operational phase of assets using building information modelling
  3. BS 1192-4 Collaborative production of information. Part 4: Fulfilling employers information exchange requirements using COBie – Code of practice (due to be published Summer 2014)
  4. Building Information Model (BIM) Protocol
  5. GSL (Government Soft Landings)
  6. Digital Plan of Work (in preparation)
  7. Classification (in preparation)

 

1. PAS 1192-2:2013 builds on the processes described in BS 1192-2007, and introduces new concepts such as employer’s information requirements (EIR) – the employer’s expression what information they require from the project and the format it should be in, and BIM execution plans (BEP) – the supply chain’s response to the EIR showing how it will meet its requirements.

Read more of this post

Buildings – Plugging the Performance Gap

This blog was written by BSRIA's Henry Lawson

This blog was written by BSRIA’s Henry Lawson

What do The Titanic, London’s Millennium Bridge, and The Leaning Tower of Pisa have in common? One answer is that as structures they all failed to “perform” as expected. The Titanic, designed with the latest technology to achieve a success  rate of approximately 100% safe Atlantic  transits, actually achieved a disappointing 0%. The Millennium Bridge, fine and inspiring though it was, failed to take account the consequences of perfectly natural, if little understood, human behaviour – the tendency to walk in sync on a naturally moving structure – with potentially alarming consequences. It had to be radically re-engineered before reopening in 2002.

The Leaning Tower of Pisa, which I was able to climb last month, failed in the most fundamental requirement of most buildings – staying permanently upright – though in some-ways of course this very failure was the secret of its long term success and certainly the main reason that people like me still pay good money to climb it more than 800 years after it first started leaning.

When buildings fail to deliver the intended results, we talk about a “performance gap”. While this can embrace many areas including cost, safety and comfort, we tend to talk about this particularly where energy performance is concerned. This reflects the fact that energy performance is at least ostensibly a goal of most of those involved in the design, construction and management of buildings, and that as energy prices rise and concerns over the impact of greenhouse gas emissions become more acute, the sense of urgency can only increase.

Some of the reasons for this are highlighted in a useful new book “How Much Energy Does Your Building Use?” by Liz Reason (Dō Sustainability) whose launch I attended in London last week. The book highlights examples of buildings initially hailed as energy efficient which spectacularly failed to live up to their reputation. It also shows how these failings can emerge at any stage of the building process from initial planning and design through construction, commissioning and occupation and operation, and considers how these problems and shortcomings can best  be addressed and avoided.

What I want to focus on here is one central question: How do we know how our building is actually performing, let alone how it is likely to perform in future? The key here is information, which needs to be collected and then analysed, not just to show us any obvious performance issues but also point to potential problems or just unusual patterns that deserve further investigation and explanation.

This points to a central role for Building Energy Management Systems (BEMS). These are offered by a wide range of suppliers, including most of the major Building Automation providers, and present wide ranging functionality. Central to almost all of them is the collection and analysis of data, sometimes in prodigious volumes. A well implemented BEMS enables you to keep track of what your building is actually doing, irrespective of what it was intended or expected to achieve.

'Performance gaps' in buildings are nothing new...

‘Performance gaps’ in buildings are nothing new…

Another way in which the performance gap points towards BEMS is that while the value of BEMS has been widely recognised for some time in the retrofit market, especially for the huge mass of buildings constructed in 1960 – 1990, there has sometimes been a tendency to assume that more recent buildings, being generally built to much higher standards, can, to a degree, “look after themselves”. If a building really is “zero energy” then what is there to manage, at least from an energy point of view?

However, if there are basic failings in the design itself, the way it has been implemented or commissioned, or the way the building is operated in relation to its actual usage, then the performance gap can loom up large and un-ecological as a fire-breathing dragon. Sometimes the failings can be obvious: a stiflingly uncomfortable office can jump up and hit you as much as a wildly wobbling bridge. But in other instances, energy wastage is less obvious. Real performance issues emerge only when the actual data is collected and analysed over time.

This month BSRIA publishes the latest update of the study “BEMS Market 2014 Q2 :Developments in Europe and the USA”, a study which, with its regular quarterly updates, helps you to keep up to speed with the newest developments in this exciting and important area.