The BIM Level 2 jigsaw – nearly complete?

The Level 2 programme was defined in the BIM Strategy which is available at  www.bimtaskgroup.org

The Level 2 programme was defined in the BIM Strategy which is available at
http://www.bimtaskgroup.org

In my blog article back in June  I discussed how the UK Government had refined its Level 2 BIM requirement and express it in the form of compliance with seven components:

  1.  PAS 1192-2:2013 Specification for information management for the capital/delivery phase of construction projects using building information modelling
  2. PAS 1192-3:2014 Specification for information management for the operational phase of assets using building information modelling
  3. BS 1192-4:2014 Collaborative production of information. Part 4: Fulfilling employers information exchange requirements using COBie – Code of practice
  4. Building Information Model (BIM) Protocol
  5. GSL (Government Soft Landings)
  6. Digital Plan of Work
  7. Classification

Since then BS 1192-4 has been published, leaving just the Digital Plan of Work and Classification elements to be completed.  As reported previously, these were the subject of a TSB-funded competition and I thought it would be useful to give an overview of how the competition went and where it is now.  This is a fundamental piece of work that is set to have a huge impact on BIM in the UK and it is vital that as much of the industry as possible has an awareness of what is happening, and get involved wherever possible to help make it a success.

The competition brief was developed, with industry consultation, and has been administered via the Innovate UK (formerly TSB) SBRI programme under the title “A digital tool for building information modelling”.

The competition process involved two phases – Phase 1was a feasibility study, with organisations or consortia invited to submit proposals with funding of up to £50k (including VAT) available to each.  Three teams were awarded these phase one contracts:

  • RIBA Enterprises Limited, together with BIM Academy, BDP, Laing O’Rourke, Microsoft and Newcastle University
  • BRE Global Limited, with buildingSMART UKI
  • CIBSE on behalf of a group of industry professional bodies known as C8, consisting Association for Project Management (APM), British Institute of Facilities Management (BIFM), Chartered Institution of Building Services Engineers (CIBSE), Chartered Institute of Building (CIOB), Institution of Civil Engineers (ICE), Institution of Structural Engineers (IStructE), Royal Institute of British Architects (RIBA) and Royal Institution of Chartered Surveyors.

The results of the Phase 1 stage can be seen here.

On completion of Phase one, two of these submitted bids for Phase 2 – RIBA Enterprises Limited and BRE Global Limited, and RIBA Enterprises Limited was awarded the single Phase two contract.

At the time of writing, the results of the Phase two competition had not been posted on the Innovate UK website so it has not been possible to compare what RIBA Enterprises has said it will deliver with the functional specification.

As RIBA Enterprises has developed Uniclass2, which it uses for some of its other software tools, it is probably safe to assume that the classification solution delivered as part of this competition will be based on that format.  That being the case it will be interesting to see how Uniclass2 is developed to cover all necessary instances, and not just those which may occur within the 3D model.  The classification system needs to be capable of capturing everything which may be held within the common data environment (CDE) in order to make the objectives of the standards such as PAS 1192-2 and PAS 1192-3 a reality – the PIM during construction and AIM during operation being the sole sources of information for further use, having been verified and validated against the EIRs and OIRs.

Many experienced BIM practitioners recognise the need for a comprehensive classification system to make information available throughout the life of an asset, letting it be used time and again rather than having to recreate it, and this project could make this a reality.  However, careful thought needs to go into it to make sure that everything that needs to be classified can be, and in a way that can be understood.

Infrared technology protecting against Ebola

This blog was written by Alan Gilbert, General Manager of BSRIA Instrument Solutions

This blog was written by Alan Gilbert, General Manager of BSRIA Instrument Solutions

As Heathrow and many other international airports start to employ screening procedures in the fight against the spread of Ebola, BSRIA Instrument Solutions General Manager Alan Gilbert discusses how the technology will be used.

Q. What technology will be used at Heathrow?

Heathrow will be using IR (Infrared) spot type thermometers to take skin temperature of people that have been identified as coming from areas affected by the current Ebola outbreak. These thermometers can detect skin temperature at a distance, which in this application means there is no direct contact between passengers being screened and the instrument being used.

Q. A number of international airports are starting to use thermal imaging camera to screen for the Ebola virus, why is that?

Although there is a low risk of catching Ebola by sharing a plane with an infected person Ebola is a particularly virulent virus and nations and airlines are acting responsibly by identifying any infected travellers prior to boarding the plane or entry into a country. The use of thermal imaging cameras is a cost effective unobtrusive means of detection to screening a large volume of travellers.

Q. Why use thermal imaging cameras?

Thermal Imaging cameras are used to identify and measure the amount of heat that any object produces and emits, this includes people. The thermal imaging equipment used is able to identify the temperature of a large number people simultaneously and with processing software they can identify quick any individuals with potentially a higher body temperature.

Q. What will the thermal image show?

It depends on the technology which is being, but in general terms the thermal image will show that an individual has a higher than normal body temperature and further testing and questioning is needed.

Q. Has thermal imaging been used before?

Yes, in the past when we had a SARS outbreak some high tech thermal imaging cameras were used to identify individuals with increased Thermal image crowdtemperature through an individual’s sinus tracts. Cameras were used around the world in this application as a tool to reduce the spread of the disease and to quick spot individuals who may be at risk from infection.

Q. Which technology is better for screening?

Both thermal imaging cameras and IR thermometers are equally appropriate for use in screening as both technologies will identify passengers who are emitting a higher temperature, this will then allow the authorities to identify passengers who need to undergo further medical examinations.

Q. What happens if somebody is stopped as a result of the screening?

There will be a medical team at the airport who will quarantine the individual and undertake a further medical examination, this will involve undertaking a blood test to allow a proper diagnosis to be made.

Q. If you get stopped as a result of the screening does it mean you are suffering from Ebola?

Not necessarily, you could have no more than a common cold or an upset stomach, conversely somebody with Ebola may be in the incubation period of the disease and as a result not show up as being infected as a result of the screening, due to the numbers of people travelling it would not be practicable to undertake full medical examinations on all travellers, so using thermal imaging cameras is considered to be the best method for undertaking mass screening on travellers.

 

 

 

Smart Building Conference – The Human Factor

This blog was written by BSRIA's Henry Lawson

This blog was written by BSRIA’s Henry Lawson

On 7th October I attended the SmartBuilding Conference in central London, in the course of which we were treated to the views of a range of industry-experts including BSRIA’s own Jeremy Towler.  Like all worthwhile conferences, it presented a mixture of familiar messages being elaborated and reinforced – such as the all too frequent gap between the vision and the delivery of smart buildings, and the vital role of retrofit in a world where 80% of the buildings we will be using in 2050 have already been built, and some less familiar insights. These are some of the main points that I took away.

While we often talk, rather platitudinously about, buildings, or businesses being “all about people”, we spend less time thinking about what this really means in practice.  An often overlooked fact is that people’s statements of what they want is often a poor guide to how they will actually take to new technology. This is not just because we often lack the understanding and vision of what is possible (as in the famous Henry Ford quote that “What people ‘really wanted’ was not cars, but faster horses.”), but also because (as every psychologist knows) we are much less rational and consistent in our judgements than we like to think we are. This places a premium on observing how people actually use buildings and adapting them and, even more so, future buildings.

Effectively observing and responding to the way people use buildings has wider implications.  One speaker suggested that the general move from a product-based to a serviced-based approach (as exemplified by cloud based solutions and the increasing tendency to lease equipment and facilities) is likely to penetrate from the “easy hits” to the more general areas of building services and smart technology, even potentially to the concept of a “building as a service”, where those who design and construct and configure the building are also those responsible for running it, helping to combat a problem where a building is designed supposedly to be smart, by people who then walk away having handed it to a completely different group, resulting in a loss of understanding, continuity and accountability.

Having buildings that genuinely learn and evolve in response to users’ changing needs over time calls for flexible and adaptable approach to design and construction so that they can cope better with changing needs. One way of achieving this is by using more modular construction techniques, which can at the same time reduce construction costs. Project Frog which has been responsible for a number of modular buildings in the USA was cited as an example of this.

Where an end-to-end approach is lacking, smart technology is too often a late add-on which means that it is not fundamentally designed into the building, and that those implementing it lack a connection with the original concept.

With IT increasingly at the heart of buildings, IT departments need to be involved from the early stages, and if engaged correctly they can help identify and address problems, including some of the most potentially serious challenges such as building cyber security.  Too many organisations still see IT and Facilities Management as separate disciplines to be kept siloed.  This can lead to failures of communication, and worst case, to actual conflicts.
There was also a lot of discussion of the role of more specific types of technology. For example, wireless technology is recognised as a useful backup, and for fixes to problems where the building can’t easily be rewired (historic buildings come to mind here) or where a ‘cheap and cheerful’ solution is sought, but is unlikely to become reliable enough for critical services, owing to fundamental problems of potential interference and obstructions which can arise unpredictably. This reminds us that “You cannae change the laws of physics” is a maxim that extends well beyond grainy back-editions of Star Trek.

There was much discussion of the way in which companies that have not traditionally been thought of as buildings- related, even in the most technological way. BSRIA research has already identified how IT companies like IBM and Microsoft are starting to make an impact in the world of smart buildings, now joined by Google and Apple, especially at the residential end of the market. This raises intriguing questions. On the one hand these companies bring not only deep knowledge of key areas of IT, especially in processing ‘big data’, on the other they  also have massive financial resources and proven commercial acumen, which could help to spearhead and open up  new markets.

However there are also fears that the delivery model typically deployed by companies like Google and Apple may not lend themselves to the more complex demands of building management. Simply buying a “smart home kit” from an Apple or DIY store is unlikely in itself to give you the hoped-for results in terms of improved energy efficiency, comfort and security. This could even lead to a consumer backlash that sets back the technology. There was a consensus that consumers will need experts who can provide advice and also ensure that systems are properly implemented. This in turn requires a range of skills broader than the “traditional” electrician, plumber, heating engineer or security engineer.

We were reminded that major disruptive technologies are normally led by new entrants into the field, posing a challenge to the major established players. Indeed it seems quite likely to me that the companies that are leading the field in 20 years’ time could well be ones that most of us haven’t heard of, or which don’t yet exist.

I left the conference slightly haunted by one further thought: We heard a lot about how buildings must learn and adapt to their users’ actual needs and behaviour. This led me to wonder how far this change, if it emerges and it surely will, will in turn change actual human behaviour.

Since our ancestors emerged from the forests and savannah thousands of years ago, humans have gradually been losing the need to be acutely aware of the physical world around them. First there was the loss of contact with the wilderness, and nature “red in tooth and claw”. Then the industrial revolution alienated us increasingly from the basic processes of producing food and the physical manipulation of nature.

Smart conferenceThe electronic revolutions mean that we need to understand less and less about the way that for example, our cars or heating systems or computers operate and indeed we meddle with them at our peril.

If even buildings and cities come to observe, know and “understand” us and anticipate our actions, will humans then become, physically at least, almost wholly reliant on outside intelligence, and end up, in effect almost leading an artificially controlled ‘virtual’ existence, and what role will human intelligence then play as opposed to artificial intelligence?

This might seem far-fetched, but big changes often tend to occur much faster than anticipated, and often, far from being incremental, can depend on sudden tipping points. There are also of course  formidable barriers, not least the public reaction to the prodigious level of data sharing that would be needed to make all of this even remotely possible.

Nonetheless, I for one find it intriguing that the development of the smart building could just be part of the gradual emergence of a new “breed” of human, in terms of what they think and more importantly how they interact with the world.  Could we be seeing the emergence of a kind of “virtual man” where the boundaries between the human and the buildings, vehicles and cities we use and inhabit are hopelessly blurred?

Building services now look more exciting today and indeed  look closer to science fiction than could have been imagined when BSRIA started out 59 years ago.

Think in £s not kWhs and Start Reaping the Rewards

Steve Browning is Marketing Manager of Trend Controls, a BSRIA member company

Steve Browning is Marketing Manager of Trend Controls, a BSRIA member company

Often considered an unwelcome expense, the truth is that investing in energy saving initiatives offers significant financial benefits, as well as enhancing an organisation’s environmental credentials. I’m Steve Browning, marketing manager of Trend Control Systems and in this blog I will explain how a Building Energy Management System (BEMS) can increase the bottom line.

Although better energy management and the need to reduce carbon emissions are both moving to the forefront of the corporate agenda, they are doing so far too slowly. Rising prices, combined with the increasing scarcity of resources and a growing raft of environmental legislation, means that addressing the issue of how energy is used is no longer just an option, but something that requires serious attention by all businesses.

To put the issue into perspective, the long-term framework outlined by the Department of Energy and Climate Change (DECC) sets out plans for achieving the reductions stated in the Climate Change Act 2008. When compared to 1990 levels, this equates to a reduction of at least 34 per cent by 2020 and at least 80 per cent by 2050. As they are responsible for 17 per cent of the UK’s carbon emissions, the nation’s 1.8 million non-domestic buildings are at the very heart of meeting this challenge.

The government is also ramping up the pressure to comply. In addition to the CRC Energy Efficiency Scheme, the Climate Change Levy (CCL), Air Conditioning Assessments, Display Energy Certificates (DECs) and Energy Performance Certificates (EPCs), earlier this year the Energy Savings Opportunity Scheme (ESOS) was introduced to address the requirements laid out in Article 8 of the European Union (EU) Energy Efficiency Directive.

It means that ‘large enterprises’ employing 250 or more staff, or that have an annual turnover of in excess of around £42m and an annual balance sheet total of around £36m, must complete regular energy audits. The first must be undertaken by 5th December 2015, and then at least every four years.

The government hopes that ESOS will drive the take-up of energy efficiency measures amongst businesses, enhancing their competitiveness and contributing to the wider growth agenda. Furthermore, for organisations wishing to comply with increasingly popular international standards such as ISO 50001, a certified energy management system (EnMS) must be in place.

It is therefore a constant source of bemusement and irritation to me that some organisations aren’t making the obvious correlation between investing in technology that can reduce energy use and saving money. By failing to ensure that energy is being used as well as it could be they are, quite literally, paying the price.

One reason for this could be that for energy bills are often low compared to items such as wages, research and development, and property rental. However, companies must consider other issues such as brand reputation, employee expectations and competitive positioning, while customers expect them to play an active role in reducing the carbon footprint of their operations and products.

Even more frustrating is that in many circumstances it doesn’t even involve a vast capital outlay on new technology – for example, by simply maximising the potential of an existing BEMS energy savings of 10-20 per cent are easily achievable. This could equate to a 0.1-0.4 per cent saving on a company’s total cost base, instantly increasing profitability.

When a BEMS is first commissioned it is configured around an existing building layout and occupancy patterns. These can change over time and incorrectly configured time clocks and setpoints, new layouts, and repartitioning can all lead to poor control and energy wastage.

Failure to maintain a BEMS on an ongoing basis will result in degradation of the building’s energy performance. In order to rectify this, it is advisable to undertake an audit that ascertains what can be achieved and identify any energy saving opportunities. While items such as boilers, chillers, air conditioning, and pumps can be checked to make sure they are working correctly, any maintenance issues to do with the BEMS itself or the building services equipment use can also be addressed.

BEMS providers will be able to offer expert advice on how to enhance the operation of plant by installing items such as variable speed drives. The investment can pay for itself in a matter of months – for instance a centrifugal pump or fan running at 80 per cent speed consumes only half of the energy compared to one running at full speed.

It is critical to achieve stakeholder buy-in for any business enhancement programme and by using a standard Internet browser, software based packages are available that act as a window to a BEMS. It is also possible to access utility meter readings from a BEMS and present a continually updated record of a building’s energy consumption and carbon emissions – showing employees and visitors whether they are on, below or above performance targets.

Hopefully, I have demonstrated that reducing carbon emissions and lowering energy expenditure are closely linked. The savings that can be made through the use of a correctly specified and maintained BEMS are considerable and will help achieve compliance with environmental legislation. My advice is to take action before it is no longer a choice!Trend_RGB SMALL

For further information please call Trend Marketing on 01403 211888 or email marketing@trendcontrols.com. Trend are the main sponsors of this year’s BSRIA Briefing – Smarter ways to better buildings.

You can read more BSRIA blogs about BEMS here.  BSRIA’s WMI team also produce a BEMS market report –Building Energy Management Systems (BEMS) in Europe and the USA – which is available to buy from the BSRIA website. 