Taking action on Climate Change

by Michelle Agha-Hossein, BSRIA Building Performance Lead

Most nations now recognise climate change as an established, perturbing fact that needs immediate attention. We can see the effects in the worsening and more frequent extremes of weather: flash floods, droughts, strong winds, heavy snow, heat waves, etc.

UK temperatures in 2019 were 1.1°C above the 1961-1990 long-term average and it was a particularly wet year across parts of central and northern England. Still fresh in the memory are storms Ciara and Dennis in February 2020 with strong winds and heavy rain that caused significant damage to homes and commercial buildings. There is growing evidence that periods of intensely strong winds and heavy rain are likely to increase in the future.

The UK is not the only country affected by climate change. Many other countries are (and will be) suffering disproportionately. The world’s leading climate scientists have warned that we might have just 12 years to keep global warming at a maximum of 1.5°C. After this point, the risk of extreme weather conditions will significantly increase. The increased frequency and intensity of extreme weather will affect all but is most likely to bring catastrophic consequences in many less economically developed countries, where food shortages and water scarcity can trigger deep social changes.

Immediate radical action is required to limit carbon emissions, and the built environment industry can play a crucial role by changing the prevailing culture.

Most building-related carbon emissions are generated from energy use in buildings. However, there are choices that building owners/operators can make and initiatives that they can undertake to lessen the related negative impact on the environment:

In brand new buildings, the most effective way for addressing emissions is reducing consumption through energy efficient design. In existing buildings, the issue can be addressed by efficient retrofitting and effective maintenance strategy. Adopting renewable energy technologies in both cases can significantly reduce building emissions.

Steps building owners and operators can take today.

There are several initiatives/activities that can help building owners/operators combat climate change:

  • Consider ‘net-zero carbon’ targets for your building: UKGBC launched its Advancing Net Zero programme in 2018 and published the ‘Net Zero Carbon Buildings: A Framework Definition’ in 2019. The framework provides the construction industry with clarity on the outcomes required for a net zero carbon building.
  • Ensure the required outcomes for a ‘net-zero carbon’ building are achieved: As advised by UKGBC in the framework definition, initiatives like BSRIA Soft Landings should be adopted in new build as well as in refurbishment projects to ensure a net zero carbon building will be achieved. The BSRIA Soft Landings framework provides a platform for project teams to understand the required outcomes for their project and ensure all decisions made during the project are based on meeting those outcomes.
  • Maintain your net zero carbon building effectively: Business-focused maintenance is a methodology developed by BSRIA that can be adopted to help building operators maintain critical assets effectively and efficiently to sustain a net zero carbon building within budget.
  • Investigate failure quickly: Is the energy bill for your building higher than it should be? Investigate the problem as soon as you can. The first and easiest step would be looking at the energy end use breakdown to see which areas are using more energy than expected. If the issue is related to the HVAC system, check the system’s setting points and monitor the indoor air temperature and relative humidity. Thermal imaging of the fabric of the building can also help to identify, thermal bridging, missing/damaged insulation and areas of excessive air leakage.
  • Promote a healthy diet among building occupants: This is a non-technical initiative that building owners/operators can adopt in their buildings. Eating less meat and gradually shifting to more plant-based foods is vital for keeping us and our planet healthy.  It is important to think about initiatives such as using signage or lunchtime talks, to educate building occupants about healthy diets and encourage them to eat more fruit and vegetables. Research has shown that adhering to health guidelines on meat consumption could cut global food-related emissions by nearly a third by 2050. Healthy diet is also supported by Fitwel and the WELL building standard.

Building owners and operators, to play their role in combating climate change, should ensure their decisions and the way they create and run their buildings contribute positively to the wellbeing of our planet and its citizens.

So, make a start today and choose the first thing you are going to assess/change in your building to help combat climate change.

To find out more about how BSRIA can help you improve building performance, visit us here.

Construction quality could be catching up with other industries

This blog was written by Lynne Ceeney, Technical Director at BSRIA

If you order steak and chips at a restaurant, but the waiter delivers hake in strips, you would be rightly annoyed. Instinctively you blame the waiter, but it could have been a problem with the ordering software, a misreading in the kitchen or just the wrong dish being picked up.  Whatever, you would send it back – it is not what you ordered.   In new buildings, this happens all the time.  Poor communication during the briefing, design and construction process, and poor handover and operation leads to a building that doesn’t deliver the performance the client thought they had ordered in the first place.  Unlike a dinner, it’s not practical to send a building back and wait for the one you asked for to be delivered.  Instead extensive snagging lists, expensive defect resolution and defensive “best we can do” fixes by the facilities team are often used to try and get the building closer to its intended performance – and “closer” is usually the best that can be achieved. The owner and occupier end up with a disappointing building, and the designers and construction company are left with a disappointed client.  The blame chain spreads, and it’s hard to pin down the fault.

The impacts run way beyond disappointment.  Occupier discomfort impacts staff retention, and the increased societal focus on wellbeing indicates that employees will expect higher standards from their place of work.  Poor commissioning or confusing controls mean building systems that don’t work properly and need constant attention or premature replacement, as the uncomfortable working conditions impact on worker productivity.  Inefficient buildings use more energy requiring more cash and causing more carbon emissions.  In fact buildings contribute 37% of UK green house gas emissions from gas heating, and consume 67% of the electricity used in the country.  It’s no wonder that larger investors are taking much more of an interest in the sustainability and performance of buildings rather than just the upfront capital cost.  Good buildings are an asset, poor buildings become an expensive liability in terms of operating costs and void periods. Competitive property markets compound this situation.

With a typical building having a life expectancy of at least 60 years, we are building in problems for this generation and the next.  We’re not great at mass retrofitting, (and the high demand for additional building stock means a capital, skills and material shortage) so we need to get it right first time.  Effective management tools with this aim abound in other sectors, for example DRIFT, (Doing it Right First Time), Six Sigma, LEAN and Zero Defects.  We see the approach being used in food manufacture, car making, pilot training, and patient healthcare, to name but a few sectors.  So what about construction?

Soft Landings is the equivalent tool for the construction sector.  This tried and tested process was developed to help to produce better performing buildings – not necessarily exceptional in performance, but buildings that deliver in operation what they were designed to do in the first place.  Getting a building right requires a shared focus on operational performance of the building right from the start, and throughout the design, construction and commissioning process.  The use of Soft Landings delivers this shared focus, improving communication and collaboration between all parties in the building delivery chain.  It helps everyone to avoid the pitfalls that diminish operational building performance. It fits with RIBA stages, integrates into existing construction processes, and does not require a specific building procurement model.  You can download Soft Landings guidance from the BSRIA website .

However it is always helpful to find out about real world experiences, and to talk to others who are using Soft Landings to help them to produce better buildings.  With this in mind, BSRIA have organised the 2017 Soft Landings Conference (June 16th 2017 at RIBA, Portland Place, London W1B 1AD). You will hear from a range of speakers from different parts of the construction process – including clients – who will explain how they have used Soft Landings in their projects, and the value that it has delivered for their buildings.  You will also hear their hints and tips, and there will be plenty of time to ask questions and take part in discussion both in conference and over lunch.

It’s time for the construction industry to catch up with other industries in terms of quality, to produce buildings that perform as expected, through a delivery process that gets it right first time.  Soft Landings is a process that helps the delivery chain to do this.  For more information on the conference please contact our Events Manager, Tracey Tilbry.

 

The Lyncinerator on… Bathroom taps

This blog was written by Lynne Ceeney, Technical Director at BSRIA

Don’t get me started.  We’ve all been here.  You’re out and about, maybe having a meal, going shopping or visiting offices, and you have to use an unfamiliar bathroom.   You approach the basin to undertake that most basic of human hygiene tasks, washing your hands.  And looking around, you realise you have absolutely no idea how to turn on the tap…  and in many cases, you have absolutely no idea where the tap is.  If you are lucky, there is an obvious spout from which the water should come out.  However in many cases, the detective work starts here – the spout might not actually be in a tap, it might be be under the shelf, or embedded in the granite.  Second detective task:  getting the water to flow.  Sometimes it is a button.  Sometimes a toggle. Sometimes something to turn.  Sometimes a sensor – which sometimes works.  Let’s assume you have managed to actually get some water to use, and you can start on your third detective task – getting the temperature you want.  Often helpful “danger” notices warn you that the hot water is hot (really Sherlock??  – well, I guess putting up a notice is easier than sorting out the supply issue). Clearly many, tap designers are a fan of puzzles, and assume you are too.  No clues to indicate how to adjust temperature, no blue or red symbol to help you out.  You have to eliminate the suspects until you find a way that works.  And after the application of a lot of thought and puzzling, hopefully you get to wash your hands.

Presumably someone thought these taps look great – but ‘clean lines’ are triumphing over clean hands. Whilst this functional obfuscation is frustrating for the average user, it is nigh on impossible for people with learning disabilities, confusion or dementia, something that we can expect to see more of in an aging population. It leads me to wonder what the tap designers and those who chose the bathroom fittings were thinking about.  Probably not the user.

Why should you have to solve a series of problems in order to undertake such a basic operation as washing your hands?

Surely the purpose of designing a functional object is to get it to work, and that requires a combination of form, technology and human behaviour.  The human / technology interface is a critical element of design.  It is irritation with taps that has prompted my thinking, but it led me to wider thinking about the design of buildings and their systems, and a series of questions which maybe we should use as a checklist.

Human error is cited as one of the problems leading to poor building performance, but isn’t it really about design error?  Are we more concerned with what it looks like rather than how it will work?  Are we introducing complexity because we can, rather than because we should?  Why don’t different systems work with each other? Are we thinking about the different potential users?  Do we understand the behaviour and expectations of the people who will use the building or are we expecting them to mould to the needs of the building? Is design that confuses sections of the population acceptable?   Are we seeking to enable intuitive use or are we setting brain teasers? Do we care enough?

We should wash our hands of poor design.  But once we have washed them we have to dry them.  And you should see this hand dryer.  Don’t get me started…

Lynne Ceeney will be contributing a bi-monthly blog on key themes BSRIA is involved in over the next year. If there’s something that ‘gets you started’ let us know and we may be able to draw focus to it in another blog. 

Contractors can’t build well without clients that lead

Did anyone see the recent news story on the Edinburgh PFI schools with structural failures? In 2016 we shouldn’t be constructing buildings with feeble brickwork. We have Victorian and Edwardian schools that have been standing for over 100 years without these problems. More ironically we have 1960s CLASP schools – built on a budget with the flimsiest of constructions – still standing and performing their role well after their sell-by date. OK, they’re usually freezing in winter and boiling in summer, with asbestos in places a power drill shouldn’t reach, but at least they’re still standing.

The reasons for these high profile failures are easy to park at the door of the PFI process. One can blame cost-cutting, absence of site inspections, and lack of quality control. Some even say that the ceding of Building Control checks to the design and build contractor is a root cause: site labour can’t be trusted to mark their own exam paper when their primary interest is to finish on time and under budget.

Some commentators blame the design process, and bemoan the loss of days of the Building Schools for the Future programme when design quality was overseen by the Commission for Architecture in the Built Environment (CABE). The erstwhile CABE may have tried to be a force for good, but project lead times become ridiculously long and expensive. And would it have prevented structural failures? Hardly likely.

The one cause of these failures that doesn’t get enough press coverage is the important client leadership and quality championing. It can be argued that clients get what clients are willing to pay for, and there’s no industry like the construction industry for delivering something on the cheap. The cost-cutting, the emphasis on time and cost at the expense of quality control – all this can be pinned on a client base that does not lead, demand, oversee, and articulate what it wants well enough to prevent the desired product being delivered at the wrong level of quality at the wrong price.

Which means that clients have to a) get wiser on what can go wrong, b) get smarter with their project management, and c) articulate what they want in terms of performance outcomes. Truly professional designers recognise this, and are prepared to guide their clients through the shark-infested waters of writing their employers requirements. But once that is done the client’s job is not over. They can’t simply hand the job over to the main contractor and turn their back until the job is complete. They need to be closely involved every step of the way – and keep key parties involved beyond practical completion and into the all-importance aftercare phase.

Soft Landings provides a chassis on which focus on performance outcomes can be built. The chassis provides the client with a driving seat to ensure that standards are maintained, along with a shared construction team responsibility to make sure the building is fit for purpose.  The forthcoming BSRIA conference Soft Landings in London on 23 June is a good opportunity to learn how this can be done. It will focus on workshops where problems can be aired and solutions worked through. It will be led by experts in the field who can suggest practical solutions for real-world projects. Why not book a place for you and a client? For more information visit the BSRIA website. 

Government Soft Landings

This is a blog by Peter Corbett, Principal Quality Inspector at Essex County Council

This is a blog by Peter Corbett, Principal Quality Inspector at Essex County Council

As a Local Authority employee I am well aware of the push for both savings and value for money, it is therefore reassuring to see the importance the Government is affording their version of ‘Soft Landings’.

The Cabinet Office sees soft landings as the ‘golden thread’ of BIM, rather than a delivery tool, and is looking for three key benefits from its implementation, those being; Improved Environmental Performance, Improved Financial Performance and Improved Functionality and Effectiveness.

The Government’s Soft Landings policy drawn up in September 2012 recognised that ‘The ongoing maintenance and operational cost of a building during its lifecycle far outweighs the original capital cost of construction, and GSL identifies the need for this to be recognised through early engagement in the design process.

To help the development of GSL a stewardship group was formed to which all government departments and agencies were invited. This group generally meets quarterly with around twenty department and agencies represented. It seeks to update the GSL implementation progress across departments, develop training ideas and determine ways of measuring the benefits that could be gained from the process.

GSL has been the archetypal snowball, steadily gathering pace as it moves toward 2016 when the Cabinet Office has asked for its adoption by all central government departments and agencies, and gradually increasing in size, as with each stewardship meeting more departments and agencies are in attendance.

I was fortunate enough to receive an invite to the last GSL stewardship meeting through my links with the BSRIA Soft Landings User Group and as a Local Authority representative, and was encouraged to see the enthusiastic approach to soft landings from some of the more engaged departments, they like ourselves see the advantages soft landings could offer (albeit from an FM focussed approach that more considers the ‘In Use’ benefits) and are eager for the evidence of this that case studies and their like could provide. Of course as with most matters concerning Central & indeed Local Government the journey is never straight-forward, and as could probably be expected the speed of soft landings adoption varies greatly both in levels of commitment and of development between each Government department and agency.

So what next for GSL? On Friday 7th November there was a GSL supply chain engagement day, to which all Government departments and agencies were invited and encouraged to extend invites to their design, construction and facilities management partners. Attendees were treated to seminars on what Government Soft Landings actually are, why they should be used and how they should be implemented, as well as what training and ongoing support could be provided.

Soft_Landings_logo-highIt was fairly evident from the nature of the questions from Government department representatives that there remains a lot of work to do to obtain both a participative and consistent approach across all departments, as well as the difficulty in impressing on the supply chain providers that success on a project is not merely about building to budget and programme. As pointed out by one contractors’ representative ‘We know of Soft Landings, but that’s where our knowledge ends’, a better description of what GSL actually is was requested with examples of what ‘success’ actually looks like, and also recognition that there is a clear shift from Capex to Opex in the governments construction expectations. All evidence that there is still much to do to achieve wider engagement in soft landings throughout the industry.

But there remains a high level of commitment to soft landings from the Government as evidenced by this event, and this is likely to soon have an impact on those of us in Local Government. In my own Authority we have been using the principles of soft landings in order to help improve the delivery of our projects in areas that have proved problematic; this has predominantly centred on the handover and defects resolution stages, and also end-user training on their new building. For us the ethos of soft landings has been extremely beneficial, but we have been fortunate enough to get the buy-in from our framework of contractors, again some contractors are more engaged with the practice than others, however with the Governments push for the use of soft landings it should encourage everyone’s participation in the process, and hopefully to the benefit of all involved; commissioner, client and contractor.

 

Blogger profile

My working career began early 1980’s in civil engineering, after taking various qualifications I moved into construction after an acquaintance encouraged me to become a clerk of works at the age of 21.  I joined Essex County Council initially as an assistant clerk of works and have remained with the authority for almost thirty years, latterly as the authorities Principal Quality Inspector. I have more recently acted as the construction performance manager on Essex County Council’s Contractors Framework, for which I am undertaking the role of Soft Landings champion. I am a Fellow of the Institute of Clerks of Works and the Construction Inspectorate having first joined the organisation in the 1990’s.

Emerging themes from Innovate UK’s BPE programme

This blog was written by Peter Tse, Principal Design Consultant for BSRIA's Sustainable Construction Group

This blog was written by Peter Tse, Principal Design Consultant for BSRIA’s Sustainable Construction Group

Back in May 2010, Innovate UK (formally TSB) embarked on four year programme, providing £8m funding to support case study investigations of domestic new build and non-domestic new build and major refurbishment projects.  In total the programme has supported 100 successful projects to provide a significant body of work, that provide insights on the performance of various design strategies, building fabric, target performances, construction methods and occupancy patterns, handover and operational practices.  This work will be shared across the industry providing evidence based information, increasing industry understanding to support closing the loop between theory and practice, ensuring the delivery of zero carbon new buildings is more readily and widely achievable.

Currently project teams are concluding their investigations and collating their findings, and dissemination of the results of the programme will begin in earnest in the first half of 2015.  However, as the programme has progressed, there are some consistent themes that are emerging.  Focussing on the non-domestic projects, I will address a couple of these emerging themes.

The first is around adopting innovative building systems to deliver low energy consumption and comfortable conditions, and unintended consequences associated with these technologies.  This covers a broad spectrum of building technologies including solar thermal, heat pumps, biomass boilers, earth tubes, rainwater harvesting, controls and natural ventilation strategies.  Innovation in its essence will have some inherent teething problems, which is often overlooked in the charge towards reaching our carbon reduction targets.  The obvious default stance is to specify proven and reliable technologies which are delivered by a team that is familiar with the technology, but our journey towards delivering true low carbon building in operation would inevitably be prolonged.

An additional level of complexity can be added with innovative systems; one healthcare facility introduced solar thermal and a combined heat and power (chp) unit, to supplement natural gas fired boilers for heating and hot water requirements. With several sources of heat complexity is added to the control strategy, trying to strike a balance between changing heat demands of the building and optimisation of the system.  This complexity, coupled with a requirement for increased operator understanding often leads to system underperformance.

The practicalities, maintenance and associated costs of innovative systems is seldom fully realised by clients.  An office reported success of the rainwater harvesting system, but were surprised at the frequency of filter changes to mitigate the system being blocked.  Another office had to regulate a fan associated with earth tube ventilation system, as running at a higher speed caused too much noise for occupants.  A school had ingress of water to an underground wood chip store rendering the biomass boiler idle for significant periods.  A hotel employed automatic external blinds which retracted in windy conditions to avoid damage, thus offering no shade to occupants during sunny, windy days.

DC-Innovative-Construction-Services-Building-Maintenance1It is clear a reality checking process is required for design decisions to mitigate such matters.  BSRIA’s Pitstopping guide, which resides within the Soft Landings framework describes a process that allows construction teams to periodically reconsider critical design issues by focusing on the perspective of the end user.  This also provides an opportunity for the client to understand the full ramifications of implementing innovative building systems for a more informed decision, and to align client expectations.

The second theme involves the process in delivering innovative technologies, with a particular a focus on commissioning and handover.  The commissioning period residing at the end of the build process is often susceptible to being squeezed.  When the decision has been taken to adopt an innovative building system, there is increased pressure during commissioning to ensure the system is operating as intended.  With the additional complexity associated with innovative technologies, it is vital the commissioning time is adequate to complete comprehensive scenario based testing; how is hot water delivered if the solar thermal does not provide a contribution, how is the building operator alerted the status of the system, how can the operator diagnose the problem, how long can the system operate without the solar thermal contribution without major detrimental effects etc.  To ease the burden on the commissioning period, it is clear commissioning should not be afterthought, but an integral part of the build process.

The commissioning period also signals a time where many of the stakeholders with tacit knowledge of the innovative building systems have changing responsibilities. It is vital this knowledge is captured for users before the opportunity is lost.  Building manuals, user guides and logbooks need to be completed so users can relate to their building environment, understand control of the environment and capture major alterations.

Figure 1 - South façade showing café, street and incubator office blockMany projects reported that guidance for both users and operators was often lacking, with several BPE teams developing guidance as part of their projects to support users.  Commonly BPE teams have also struggled to find initial design intent and operational strategy associated with innovative technologies, highlighting the importance of handover documentation.  Training of users is another key element to knowledge continuity, but several projects reported changes in staff being a core reason for innovative systems underperforming, as documentation was not kept up to date.  The value of clear concise user guidance is evident; BSRIA’s Building Manual and Building User Guides helps individuals responsible for creating building logbook and user guides.

In this blog, I’ve only addressed a couple of areas in regards to emerging themes, to hear more about findings from the programme, come hear me speak at the Energy Management Exhibition (EMEX), at Excel, London on the 20th November, 2014.  Additionally, join the BPE community at connect.innovateuk.org, and search for Building Performance Evaluation.

Making buildings better – measuring for improved building performance

Andrew Eastwell, BSRIA CEO

Andrew Eastwell, BSRIA CEO

BSRIA has always been in the business of measuring, whether it is a physical quantity such as temperature or pressure, a market assessment such as volume of product imported to a given country or a softer, more management-orientated value such as a benchmark or satisfaction score. Measuring is a fundamental characteristic of our industry’s operations and it is in BSRIA’s DNA.

The need for accurate and more comprehensive measurement has been increasing in response to the revolution that is the low carbon agenda. Revolution is no idle description either. In just over a decade, carbon signatures of new buildings have been required to fall to “nearly zero” – yet few owners were even aware of their building’s operational carbon use at the start. In looking backwards over the past few years, I think BSRIA can be proud of its role in promoting the increased use of through-life measurement embedded in processes such as Soft Landings and the associated building performance evaluations.

There is another BSRIA process that is associated with the collection of measurements. This is the process that turns detailed, often randomly accumulated and frequently disconnected data and information into documents that can be used by our members to guide them in their work. A couple of decades ago this process was greatly enhanced by the availability of a managed construction research programme that not only contributed funds from central government but much more importantly brought focus and long term stability to the accumulation of knowledge. This stability was crucial since it enabled individuals to establish research skills and careers with enduring value to the sector they served. Loss of this programme has also resulted in a loss of cohesion between frontline companies willing to collaborate within the longer term research process.

There is a however a new kid on the block that may be about to revolutionise the traditional measure/analyse/publish process that has dominated research and guidance in our sector.

As disruptive technologies go, Big Data has managed to remain under the public radar quite well until the recent disclosures of the USA “Prism” project. Under Prism, colossal quantities of data harvested from both open and private sources are analysed to identify supposed threats to homeland security. It is the use of automatic analytics software combined with large arrays of sophisticated new sensing technologies that makes Big Data techniques so intriguing for the built environment sector.

By way of example, consider the problem of maintaining comfortable temperatures in a space. Traditionally we have used lab research on volunteers to establish what “comfort” requires. Ole Fanger took years to generate his widely used algorithms but they still do not cover all the possible variables that affect perceived comfort. We now use a thermostat, with a setpoint guided by Fanger, and assume that all is well with our occupants. In the new paradigm, cameras utilising facial recognition software will be capable of spotting yawning (too hot, too much CO?) or sluggish activity (too cold). This data is available for every worker in a given space and a “voting” system used to optimise comfort over the group.

But of course there is more. This data could be available from many sources in a Prism type environment. There would now be the potential to mine the data to establish new benchmarks feeding back to the design process that can be tailored to the particular activity type. Schools, offices, homes and shops each can be analysed not just to establish a single setpoint value but to understand in great detail the envelope or distribution of responses. At last, proper large scale data sets can aid our work – and most of what we need to do this is already available through installed BEMS.

There is one further gain possible from this approach. Traditional academic research leading to refereed papers and thence to institutional guidance can take half a working lifetime to complete. Big Data results can be achieved in hugely reduced timespans. Take the case of adverts you see on Google – these are tailored specifically to you based on purchase decisions you may have only made via unconnected sites a few hours earlier. Scary but true.

Big Data is where BIM, Smart Cities, performance contracting and responsive design meet. It challenges all the preconceptions of professional codes, cuts swathes through the notion of privacy and opens up “our” market for knowledge to an entirely new set of competitive players. The next decade is going to be seriously exciting and I am sure BSRIA will remain strong to its ethos of Measuring and Managing in this startling new environment.

BSRIA provides a range of services to conduct and support BPE, from the complete evaluation to providing energy monitoring instruments and benchmarking building performance.

How to procure Soft Landings

BG 45/2013 Soft Landings procurement Guide

BG 45/2013 Soft Landings procurement Guide

BSRIA has just launched its latest guidance on the Soft Landings graduated handover process.   How to Procure Soft Landings – guidance for clients, consultants and contractors is designed to help clients and their professional and building teams frame their Soft Landings requirements in a consistent and structured manner.

 The guide is a response to two clear trends in the use of Soft Landings. Primarily, clients aren’t sure what they are asking for when they call for it in tenders. Construction firms are seeing wide differences in client requirements. The initiated clients may spell it out, but for every expert client there are 20 who simply ask for Soft Landings without a clear idea of what it is.

 Many builders and contractors, particularly those not up with current thinking, are similarly clueless on how best to respond. That’s one of the downsides with an open-source protocol – the viral spread of Soft Landings is a good thing, but a lack of certification and control means that the uninitiated can easily catch a cold.

 Second, Soft Landings is being adopted by central government as a formal procurement policy. This is Government Soft Landings (otherwise known as GSL), a Cabinet Office-inspired interpretation of Soft Landings for government clients. While it’s not a million miles away from the official version published by BSRIA and the Usable Buildings Trust, GSL takes a more facilities management perspective of the process and focusses far more on getting guaranteed outcomes from the construction industry. GSL is slated to be mandated for central government projects in 2016, along with the adoption of Building Information Modelling (BIM), with which Soft Landings is well-suited.

 So what we have, then, are commercial clients still a little confused in their (voluntary) adoption of Soft Landings. On top of that is an incoming group of government clients, building anything from schools to prisons to aircraft hangers,  for whom Soft Landings is a huge unknown but who will be mandated to adopt it. BSRIA’s view is that it might be a good idea to lay out the best ways of expressing Soft Landings in client requirements, pre-qualification questionnaires, and invitations to tender, so that the clients and industry alike get greater consistency in Soft Landings projects from the very outset.  

 The procurement guide has benefited substantially from the Soft Landings User Group, a BSRIA-run team of clients, architects, consultants and contractors who have learnt from experience on Soft Landings projects what works well and what doesn’t. This learning has been used to create practical, generic requirements for Soft Landings activities that can be used in project documentation. 

 A body like the User Group is absolutely vital for the practical development of Soft Landings. BSRIA knows it doesn’t have all the answers, and in any case should not dictate how Soft Landings is put into operation on real projects. Each project has its own needs and objectives, and each form of procurement throws up its own set of opportunities and challenges. The trick is to find out what works in each context, and try and find ways round thorny issues like novation and cost-cutting for instance, both of which can compromise the best of intentions.

 The guide provides specifically-worded requirements for each step in each of the five stages of Soft Landings.  The guidance is split into three sections, with requirements worded for clients appointing professional designers, clients appointing main contractors/builders, and contractors appointing sub-contractors.  Inevitably, there is some repetition, but the guide gets round that at relevant points by referring the reader to sections in the guide where a specific requirement is more logically located. 

Stage 3 - Pre-handover

Stage 3 – Pre-handover

The example shown is typical. Energy metering installations are proving to be a major problem – they are installed to satisfy Building Regulations, but are often not set up in a way that makes them useful. Although the Soft Landings Framework calls for an energy metering strategy, the procurement guide goes a step further by spelling out what should be provided, in this case at the pre-handover stage. Each requirement is supported by explanatory text that gives the main contractor, in this instance, some background context and the reasons for the requirement.

 Some Soft Landings stages may have more than one worded requirement. Some optional requirements have also been provided, for instance in the aftercare stages where it may be important to spell out precisely who should be involved and for how long.

 For example, under the core requirements for main contractors appointing sub-contractors, contractors have the option of requiring a subcontractor to be retained to assist the client and other members of the project team during handover, and afterwards to monitor the building’s performance. Some sub-contractors may be required to be based on site full-time during the initial aftercare period to assist with end-user queries and to undertake fine-tuning of systems. This would not typically apply to a ductwork sub-contractor, but it would usually apply to a controls sub-contractor. More critically, it could apply to any contractor whose systems or components come with automatic controls, particularly those with bespoke communication protocols (seemly most of them) which can only be adjusted by the supplier after payment of a fat call-out fee. If you’re nodding at this point, you know how it is. The Soft Landings procurement guide now covers this issue, and many others like it.

 An opportunity has been taken to fill gaps in the Soft Landings Framework, published back in 2009 when practical experience was a bit thin on the ground. For example, the guide contains a generic design work stage which was not included in the Framework. The procurement guide also provides more detailed advice on principles of procurement and tendering, how to include Soft Landings in tender processes and interviews, and some advice on the best way to budget for Soft Landings.

 The timing of the guidance also coincided fortuitously with the publication of the 2013 RIBA Plan of Work, which gave BSRIA the opportunity to align Soft Landings stages against the new RIBA stages, and those published by the CIC. There’s also a public sector Soft Landings decision tree included to help government and local authority clients dovetail their procurement requirements with Soft Landings requirements.

 Building performance research is identifying many critical aspects of procurement where clients and the construction industry need to tighten up their respective acts. The commissioning manager is a critical role, and the earlier they can be appointed the better. The procurement guide offers some advice on how to do this, and what their role should be in Soft Landings.

 Soft Landings is not job in itself but a set of roles and responsibilities shared among the client and project team. However, on large jobs particularly a co-ordinator may be needed to make sure the administration is carried out. Paperwork – which could include updating operational risk registers in BIM models for example – needs to be done by someone. If this isn’t covered, Soft Landings might fail ‘for want of a nail’.

 BSRIA hopes that How to Procure Soft Landings – guidance for clients, consultants and contractors will provide all that clients and project teams need to put Soft Landings into operation.  It is a practical guide to accompany the Soft Landings Framework – still the industry bible on what Soft Landings is about, and why you should adopt it.

 With all this talk about the performance gap between design and building operation, we mustn’t lose sight of the fact that the act of procuring a building and constructing it is a team enterprise. No-one goes into the process with the intention of doing a bad job.  Events, like many things in life, can conspire against it. What Soft Landings tries to do is provide toeholds for everyone involved to do a better job in the face of budgetary, time and skills pressures.  How to Procure Soft Landings – guidance for clients, consultants and contractors provides a whole load more toeholds for everyone.

 BSRIA BG45/2013 How to Procure Soft Landings – guidance for clients, consultants and contractors is available from BSRIA bookshop.

Soft Landings – it’s not all about the cake!

A guest post by Stuart Thompson of Morgan Sindall

Soft Landings Workshop

Soft Landings Workshop

Following on from my previous post regarding the UEA low carbon project I’d like to share our progress with the inclusion of Soft Landings.

Last week our soft landings champions met for our fifth workshop, habitually in the cafe over some cake. Rod Bunn from BSRIA joined us this time to check that we were still on track, almost a year after he helped me to introduce the soft landings framework to our UEA project stakeholders. We are in Stage 2 of the framework and we are really getting a grasp of what it’s all about, Stage 2 focuses on design development, reviews similar projects and details how the building will work. Over the last two months we held some ‘reality checking’ workshops on various topics and have gathered some great feedback on our RIBA Stage D design. This will be used to shape the detail as we move into RIBA Stage E design.

During our soft landing gatherings, the champions are challenging ourselves with thoughts like:

  • are the BREEAM Outstanding & PHPP figures really relevant to our building users? How do we demonstrate their great value to the users?
  •  ensure that our soft landings champions are empowered, to ensure that they are accommodated by the wider project team
  • can we recognise and utilise people’s talents and abilities and identify the environment in which they function most effectively?
  • has the soft landings process captured all of the creative ideas from the wider project team? 

We are also looking to create a back-casting report on Post Occupancy Evaluation and occupancy satisfaction by the

Soft landings delivery plan

Soft landings delivery plan

next meeting. We glanced through a few examples of what the client would like to see. Thinking about this report now (that will be needed in say 2 years time), is an example of how the  progressive, forward-thinking approach of soft landings will provide benefit to the client at no additional cost.

Our soft landings meetings are productive, I look forward to these, and it’s not simply about the cake!

Have you included Soft Landings in any of your projects? What are the challenges and achievements you’ve faced?

How will you invest in Soft Landings?

Budgeting for better building handover

Soft Landings is an open source process designed to overcome problems after handover. It is arguably an increasingly important part of procurement philosophy. Three year periods of aftercare are regularly being considered a core element of project plans; however, with Soft Landings comes great responsibility. The question is whose responsibility is it to include Soft Landings and ensure it gets done?

All clients want high performing buildings but are not always willing to pay additional costs for the aftercare process. On the other hand the building industry has a right to demand additional fees if they are taking on more responsibilities and higher risks. This standoff won’t resolve itself without some easing of tensions.

As an advocate of better building handover, I believe that both clients and contractors need to change their expectations. More fundamentally, both sides of the contractual fence need to recognise that although they may share an ambition for a high-performing building, it does not become such until it is proved to be. This means troubleshooting the building and fine-tuning it way beyond resolving snags and defects.

Once a client acknowledges that it wants its project to adopt Soft Landings, it needs to ensure that the methodology is expressed throughout the entire process. The client should not assume that the contractor will take responsibility for it all; BSRIA has seen a number of documents that puts the responsibility of Soft Landings completely with the contractors when it should definitely be a result of negotiations between all parties involved. A client also needs to be specific in what they expect from their consultants and sub-contractors. Therefore such a project should unquestionably be a collaborative effort with equal responsibility and realistic expectations shared by all.

However, this commitment can’t come for free, which begs a question of where the costs lie, and what they amount to.

Setting aside a budget

It is essential that clients acknowledge that a budget needs to be set aside for Soft Landings, especially if they want a three year period of aftercare. A reasonable place to start is by feeling a nominal budget and then to discuss how it can be best invested, all projects are different but BSRIA believes that 0.1% of the total contract value is a good place to start. Then comes the hardest part, how do you distribute such a budget?

The budget needs to include the three year aftercare period but also other additional Soft Landings activities required during the design and construction process, such as periodic reality-checking. It is also important for clients to note that they will have additional costs at later points if they take into consideration the need for independent building performance monitoring. So, overall, does the 0.1 per cent rule hold true? By and large it’s a good place to start.

If the budget proves inadequate for the client’s ambitions, then those ambitions either need to be scaled back, or the budget increased. Undoubtedly, all parties to the aftercare process stand to gain from the lessons learned, so it is absolutely in their professional interest to meet each other halfway. 

If an agreement and a clear plan can be put into place early then it is entirely possible for such a project to be successful.

To gain a better understanding Soft Landings procurement and budgets read the full article here:

 http://www.bsria.co.uk/news/soft-landings-budgets/