Ideas competition – How would you make buildings better?

PrintBSRIA and Designing Buildings Wiki are giving you the chance to win £500 of BSRIA membership, training or publications and to be featured in Delta T magazine by suggesting ways that buildings can be made to perform better. Gregor Harvie, co-founder of Designing Buildings Wiki explains why.

The UK government’s commitment to progressively reduce carbon emissions compared to 1990 levels is broadly in line with the COP21 goal agreed in Paris last year for keeping global warming well below 2 degrees centigrade.

But the Climate Change Committee has reported we are not on track to meet the fourth carbon budget, which covers the period 2023-27, and that meeting the 2050 target, a reduction of more than two thirds compared to today’s levels, will “…require existing progress to be supplemented by more challenging measures.”

construction emissions The construction industry generates or influences 47% of UK carbon emissions, and 80% of those emissions are from buildings in use. So unless the performance of buildings is improved, we will struggle to meet our carbon reduction commitments or the COP21 goal.

The tightening of the building regulations is intended to help deal with this. But figures from Innovate UK’s Building Performance Evaluation Programme have revealed that the carbon emissions of the 76 homes assessed were 2.6 times higher than their building regulations calculations, and emissions of the non-domestic buildings were 3.8 times higher.

And of course the building regulations do little to improve the existing building stock. Its estimated that around two thirds of the housing that will be occupied in 2050 has already been built.

emissions target v actualIn fact, our actual energy consumption has changed relatively little since the 1970’s, and the reduction in carbon emissions achieved to date has largely been the result of a shift away from coal powered generation. Now that the low hanging fruit have been taken, the task gets harder.

Couple this with a population expected to rise from 65 million now to around 77 million by 2050, and we have a problem.

So what can be done?

BSRIA and Designing Buildings Wiki have launched an ideas competition asking ‘how would you make buildings better’.

The challenge requires outside the box thinking to come up with radical ideas for reducing the emissions of buildings in use. Tell us about those innovations you think of in the middle of the night and the solutions to the world’s problems you only come up with after a few hours in the pub. Whether you think the answer lies in the adoption of smart technology, better regulation, on-site generation, monitoring and feedback, or more drastic measures such as carbon rationing or a contractual requirement for buildings to achieve design standards. The more innovative and far-reaching the idea the better.

The competition is very simple to enter. You don’t need to write a long essay, your idea might only take a paragraph, or even a sentence to explain.

To enter, go to the ‘Make buildings better’ page on Designing Buildings Wiki 

The winner will receive £500 worth of BSRIA membership, training or publications, and along with 4 runners-up, will be featured in the July edition of BSRIA’s Delta T magazine and on Designing Buildings Wiki.

The competition closes on Wednesday 18 May.

Architect Dr Gregor Harvie is co-founder of Designing Buildings Wiki, a free, cross-discipline knowledge base for the construction industry written by its users. It is home to more than 3,200 articles and is used by more than 10,000 people a day. Designing Buildings Wiki is supported by BSRIA, CIOB ICE, BRE, RSH+P, Buro Happold and U+I Group.

A forward thinking attitude to energy management

Chris Monson, Strategic Marketing Manager of Trend

Chris Monson, Strategic Marketing Manager of Trend

Given that in parts of the world like Europe and North America some 40% of all energy used is consumed by buildings, both companies and wider society are increasingly focussing on the energy performance of their buildings, and how to improve it.

Building Energy Management Systems (or BEMS) are computer-based systems that help to manage, control and monitor building technical services (HVAC, lighting etc.) and the energy consumption of devices used by the building. They provide the information and the tools that building managers need both to understand the energy usage of their buildings and to control and improve their buildings’ energy performance. 

I’m Chris Monson, strategic marketing manager at Trend Control Systems, and I’d like to welcome you to the latest in a series of blogs where I, along with my colleagues, examine the issues affecting the building controls industry and the use of Building Energy Management Systems (BEMS).

It strikes me as somewhat bizarre that in an age where owners, managers and occupiers of commercial premises are under tremendous pressure to operate as energy efficiently as possible, so few developers recognise the long-term value of installing a fully featured BEMS at the construction stage. Such is the value and relevance of this technology, that to my mind it should be considered as important as other elements of the building services infrastructure that are designed in as a matter of course.

BEMS facilitate greater energy efficiency and the cost savings and the environmental benefits that can be experienced as a result of investment in this technology are considerable. A fully integrated solution can have up to 84 per cent of a building’s energy consuming devices directly under its control, offering greater visibility of energy use by monitoring services such as heating, ventilation, air conditioning (HVAC) and lighting.

According to the Carbon Trust 25 per cent of a building’s energy is used in lighting, and it is estimated that around a third of the energy consumed in this way in non-domestic buildings could be saved by utilising technology that automatically turns off lights when space is unoccupied. In addition, air conditioning can increase a building’s energy consumption and associated carbon emissions by up to 100 per cent, making it imperative that its use is tightly controlled.

So why isn’t the design and installation of a BEMS happening in the initial stages of a construction project? I’m afraid that the answer comes down to a combination of cost and lack of foresight. However, to fully understand why these two factors are proving so prohibitive to BEMS implementation, we need to understand a little more about the mind-set of the developer.

Developers tend to fall into two broad groups – there are those that configure buildings for others to inhabit and others who design and build premises for their own use.

When it comes to the former, the main driver is to save costs at the construction phase and little thought is given to the building’s future occupants and how they use the building. As there are no regulations stating that a BEMS must be installed, there’s a strong possibility that it won’t be. However, this lack of forward thinking leads to future occupants having to cope with inadequate visibility and control of their energy usage and, therefore, higher overheads and a larger carbon footprint.

Regarding the second group, it often comes down to the failure of owners to specify the need for a BEMS at procurement stage and make sure that they have systems in place that will maximise the energy saving potential of the building. While this type of developer will also have one eye on the cost of the project, the increased capital costs of installing BEMS is easily countered by the return on investment (ROI), with an average payback of just three and a half years.

Whichever way you look at it, the fact is that on a ROI basis early stage BEMS implementation makes sound economic sense. It can form less than one per cent of the total construction expenditure and energy savings of 10-20 per cent can be achieved when compared to controlling each aspect of a building’s infrastructure separately. The benefits don’t stop there either, as if it is incorporated with smart metering, tariff changes can be used to offer a strategic approach to energy management and control, and the data produced gives clear signposts for potential improvements.

I firmly believe that in the current business climate to construct a new build property without a comprehensive BEMS borders on foolhardiness. Organisations are faced with growing pressure to demonstrate carbon reduction policies and do all they can to lower their energy use.

Despite the controversy surrounding the introduction of the CRC Energy Efficiency Scheme, it is here to stay and is likely to extend its scope to incorporate more businesses in the future. In addition, The Climate Change Levy (CCL), Display Energy Certificates (DECs) and Energy Performance Certificates (EPCs) also affect businesses, while compliance with certification standards such as ISO 50001 put the onus on companies to demonstrate continual improvement in this area.

It should also be remembered that building occupiers are demanding greater visibility and transparency of their energy consumption and need access to data. A failure to meet this demand could mean that prospective tenants decide to go elsewhere.

Standardisation is playing an ever more prominent role and the most significant is EN 15232, which describes methods for evaluating the influence of building automation and technical building management on the energy consumption of buildings. It enables building owners and energy users to assess the present degree of efficiency of a BEMS and provides a good overview of the benefits to be expected from a control system upgrade. The use of efficiency factors means that the expected profitability of an investment can be accurately calculated and I’m pleased that a growing number of organisations are reviewing this document and implementing some of the best practice guidance it offers.

There are those who feel that regulation is the only way to make sure that BEMS are installed at the point of initial construction, although others are reluctant to see the introduction of more onerous legislation on an already pressured construction sector. At this stage I think that regulation shouldn’t be necessary if a long-term approach to energy efficiency is factored in and the benefits of a BEMS are recognised by more developers in the initial stages of a project.

Trend_RGB SMALLFor further information please call Trend Marketing on 01403 211888 or email marketing@trendcontrols.com. Trend are the main sponsors of this year’s BSRIA Briefing – Smarter ways to better buildings.

You can read more BSRIA blogs about BEMS here.  BSRIA’s WMI team also produce a BEMS market report – Building Energy Management Systems (BEMS) in Europe and the USA – which is available to buy from the BSRIA website. 

UK Budget response from Andrew Eastwell, BSRIA Chief Executive

Andrew Eastwell, BSRIA CEO

Andrew Eastwell, BSRIA CEO

In a budget that is so close to an election there was never going to be pain inflicted that would upset the electorate and so measures required to compel anyone to spend money on energy saving was not going to feature in the Chancellor’s speech.   On the contrary, with Labour repeating their pledge to freeze energy prices the likelihood was that taxes on energy would be reduced – and with it the inevitable consequence that payback times on energy saving measures would become longer.

This is indeed what happened where the Chancellor quoted a figure for reduction of national energy costs of £7bn through a £1bn “special protection” aimed mainly at manufacturers with high energy intensity operations, steel mills, paper producers and chemical manufacturers. This package is intended to “protect… from the rising costs of the Renewable Obligation and Feed-in-Tariffs”.

A freezing of the Carbon Price Floor does also have a small benefit to householders – estimated at £15 per year.

One surprise however was a concession given to CHP which now has an exemption from the Carbon Price Floor for electricity generated.  It is aimed mainly at manufacturers using this technology but presumably will benefit other district schemes as well.

The Chancellor indicated that there would not be a reduction in renewable energy investment but since so much of that is driven by private investor money it remains to be seen how they will react to the plain intent to begin to offset the differential between UK energy prices and those in the USA.  Mr Osborne noted industrial energy costs were half the price in the USA compared to UK.

Elsewhere the statements regarding the efforts to increase house building were largely a restatement of previous announcements such as the proposed new garden city at Ebbsfleet and additional housing in Barking and Brent Cross.  What was intriguing was a proposal to give individuals a new “Right to Build” – backed with £150m of finance. The details of that will be interesting indeed as previous ministers with construction responsibilities have been keen to increase the volume of self-build homes.

Overall the budget did have a feel of being “Northern friendly” with reference to earlier consideration of HS2 construction beyond  its current plan, extension of enterprise zone tax breaks for a further three years and £270m to guarantee funding for the Mersey Gateway bridge.

Certainly the construction sector will welcome efforts to move the centre of effort further out from the London basin so that resources locked up in people, land and facilities can be fully exploited without the additional costs of working in the hothouse of the South but a budget designed for green development?  I don’t think so, that will have to wait until unpalatable policies can be applied with four years to go before a vote!

Changes to Part L – is carbon neutral possible for 2016?

282px-AD-L_Part_2A2006 was a big year for building energy efficiency, the European Energy Performance of Buildings Directive started to be implemented. This triggered a radically new Part L, requiring all new building designs to meet CO2 emissions targets. The Code for Sustainable Homes was launched that year, and the government made bold plans to require new dwellings to be carbon neutral by 2016, non-dwellings three years later.

A glide-path to zero carbon was published with interim Part L changes planned for 2010 and 2013. Come 2010, and the first round changes took place, with a 25% reduction in CO2 targets. Then the following year, the government (now a conservative-led government claiming to be the greenest ever) watered down the definition of zero carbon to exclude appliances and cooking. Fair enough, absolute zero carbon perhaps wasn’t a feasible target anyway.

Fast forward to August 2013, and the second round of changes still hasn’t happened. The government has indicated that there will be a meagre reduction of 6% in CO2 targets for dwellings, and 9% for non-dwellings, and that these will kick in in April 2014. What this says to me is that the government, at the moment, aren’t all that interested in being green. Also, that 2016 is going to be very painful for housebuilders, who will have to make a huge leap to zero carbon. This zero-carbon commitment is still in place, and was even reaffirmed in the budget announcement in March. But of course, there’s another general election before 2016….