The wellbeing and environmental effects of agile working

by David Bleicher, BSRIA Publications Manager

How many times in the last few months have you started a sentence with “When things get back to normal…”? For those of us whose work mostly involves tapping keys on a keyboard, “normal” implies commuting to an office building five days a week and staying there for eight or more hours a day.

When lockdown restrictions were imposed, things that were previously unthinkable, such as working from home every day, conducting all our meetings by video call, and not having easy access to a printer, became “the new normal”.

One thing the pandemic has taught us is that changes to our work habits are possible – we don’t have to do things the way we’ve always done them. Since lockdown, agile working has been high on companies’ agendas; but agile working has a broader scope than flexible working. It is defined as “bringing people, processes, connectivity and technology, time and place together to find the most appropriate and effective way of working to carry out a particular task.”

Working from home with a cat

The triple bottom line

Agile working is indeed about much more than changing people’s working hours and locations. It’s about how people work – becoming focused on the outcome rather than the process. It’s about making the best use of technology to achieve those outcomes and it’s also about reconfiguring workplaces to better suit the new ways of working. But, when considering these outcomes, we should be looking further than the financial bottom line. The term triple bottom line is a framework that also brings social and environmental aspects into consideration.

How, when and where people work has a major impact on their wellbeing. The past few months have served as an unintentional experiment in the wellbeing effects of mass home working. Some people are less stressed and more productive working from home, providing they have regular contact with their colleagues. Other people – particularly those who don’t have a dedicated home working space – returned to their offices as soon as it was safe to do so. It depends on the individual’s preferences, personal circumstances and the nature of the work they do.

On the face of it, it would seem that increased working from home or from local coworking spaces would be a win-win for the environment. Less commuting means fewer CO2 emissions and less urban air pollution. But a study by global consulting firm and BSRIA member, WSP, found that year-round home working could result in an overall increase in CO2 emissions.

In short, it reduces office air conditioning energy use in the summer, but greatly increases home heating energy use in the winter – more than offsetting carbon savings from reduced commuting. Perhaps what this highlights most is just how inefficient the UK’s housing stock is. If we all lived in low energy homes with good level insulation and electric heat pumps, the equation would be very different. Perhaps a flexible solution allowing home working in summer and promoting office working in winter would be best from an environmental perspective.

A possible long-term effect of increased home working is that some people may move further away from their offices. For example, someone might choose to swap a five-days-a-week 20 km commute for a one-day-a-week 100 km commute. If that is also a move to a more suburban or rural location with more scattered development, less public transport and fewer amenities within walking distance, then (for that individual at least) there’ll be an increased carbon footprint. Not very agile.

Impact of technology

There’s another aspect that may not yet come high up in public awareness. Remote working is dependent on technology – in particular, the video calls that so many of us have become adept at over the past few months. All this processing burns up energy. The effect on home and office electricity bills may be negligible because the processing is done in the cloud. This isn’t some imaginary, nebulous place. The cloud is really a network of data centres around the world, churning data at lightning speed and, despite ongoing efforts, still generating a whole lot of CO2 emissions in the process. Videoconferencing definitely makes sense from both an economic and environmental perspective when it reduces the need for business travel, but if those people would “normally” be working in the same building, isn’t it just adding to global CO2 emissions?

We don’t yet know what “the new normal” is going to look like. Undoubtedly, we’re going to see more remote working, but responsible employers should weigh up the pros and cons economically, environmentally and socially. Terminating the lease on an office building may seem like a sensible cost saving, but can a workforce really be productive when they never meet face-to-face? Does an activity that seemingly reduces CO2 emissions actually just increase emissions elsewhere? Any agile working solution must take all of these things into account, and not attempt a one-size-fits-all approach to productivity, environmental good practice and employee wellbeing.

For more information on how BSRIA can support your business with energy advice and related services, visit us here: BSRIA Energy Advice.

The Lyncinerator on… Failure

Don’t get me started.  Stuck on an interminably delayed flight, I leafed through the airline magazine.  An article on a new Museum of Failure in Sweden caught my eye.  “Only in Scandinavia” I thought, cynically.  But it made interesting reading.  The curator is a psychologist and innovation researcher who got fed up with hearing people talk only about success and not the failures that lay behind it, his view is that development only comes through learning from failure.  The fact that the museum is partly funded by the Swedish governmental department that supports industrial R&D suggests that he is not the only one to think this way.   The museum demonstrates products and services that did not take off, and explains some of the reasons why.  It was a thought provoking and informative article.

This blog was written by Lynne Ceeney, Technical Director at BSRIA

I talked to some colleagues about the museum and the article, and laughingly said I would write a blog titled “BSRIA is good at failure”.   I’m sure you can imagine the raised eyebrows, and concerns that this could be misconstrued.  And in a world of short tweets and clickbait headlines this is a justified concern.  But for an industry like ours, understanding and learning from failure is really important, and maybe we don’t talk about failure enough.

In-use failure of safety critical components and elements simply should not happen.  That’s what testing and inspection are for, although we know that sadly, these are not fail-safe.  But talking about those failures is imperative.  The causes of these failures are shared openly and quickly, so that future incidents can be prevented.  Public enquiries are one route, but for less public failures, as an industry we need to look at the “no blame” culture that the aviation industry has introduced.  (More correctly perhaps, it’s a “just” culture – where people are rewarded for providing safely related failure information.  Deliberately unsafe actions or decisions are still penalised).  If this type of safety critical failure is declared and investigated, it can and should prevent future incidents.  It seems that litigation and insurance may get in the way of the necessary “no blame / just” culture, and there is a definite need for an industry-wide approach to investigate and remedy this.

But what about failures that only interrupt occupant functioning and are inconvenient?  There is a tendency to patch or fix, or to simply replace, and to move on without capturing learning.  This is one of the points where BSRIA comes into its own.  Our Problem Investigation team get to see multiple failures in different buildings, delivered and managed by different teams.  This has two consequences: (1) we are quick at spotting the cause of problems which cannot be simply identified by front line repair teams because we know where to look with our analytics, so front line teams can fix the problem efficiently, and (2) we are able to upcycle our learning into publications, guidance and training to pass preventative knowledge to the industry.  A good example of this is our work on pipework corrosion, which we have been able to investigate in some depth and include our learnings in guidance for water commissioning.  This helps optimise the performance of existing buildings, but importantly we can also influence the design of the next generation of components and buildings.  To increase our impact, we need to encourage more failures to be reported and investigated so that we can better understand trends and problems, and report back to the industry as to how to remedy them.  This too requires an industry culture that recognises the value of learning from failure.

And of course innovation doesn’t happen without failure.   There are of course degrees of failure (the Museum features frozen pizza marketed under the brand of a toothpaste company, I would have loved to have listened to the strategy meeting for that!).  Controlled failure is useful – in our test laboratories we help establish parameters for new products through testing prototypes, and then we test the end product on behalf of the manufacturer.   We move beyond labs though, and we monitor technologies in the real world, in occupied buildings, to see what happens when expert and non-expert users are let loose on equipment and to see how it performs and what doesn’t work so well.  All useful data for the next iteration of designs, products and systems.

So BSRIA is pretty good at failure – investigation, remedy and recommendation for prevention.  And the industry clearly benefits from reporting, investigating and talking about failure.  So we need to think about how we can encourage this culturally, and how to process and use what we find.

The flight, incidentally, was very delayed.  I read the whole magazine.  And I couldn’t blame the pilot, it was a weather issue.  But the failure to deliver on board food because they had sold out – well that was a failure too far, don’t get me started…

 

The Lyncinerator, September 2017.

 

 

 

How hard can opening a new office be?

As some of you may or may not be aware, the new BSRIA North site is now open for business.

For organisations opening a new office or site, it should be a time of great anticipation and excitement as the company sets out a new path, but for many they approach this process with fear and trepidation and for those tasked with the job of making it happen, it can potentially be an extremely stressful period of time.  As Project Manager for the setting up of BSRIA North, I thought I would share with you my experiences – the very good, the sometimes bad and the occasional ugly!

This blog was written by June Davis, Business manager of BSRIA North

I will be sharing my experiences and tips on:

  • Identifying and interpreting the business requirements
  • How to determine the must have’s versus the nice to haves
  • The importance of establishing an internal project team – you can’t do this alone!

BUSINESS NEEDS

When establishing the business needs, spend time with colleagues from across the organisation to listen and understand what they would like to see from a new base – what is it about the current environment that works, what doesn’t work so well and what would improve their working environment if only it were possible!

Everyone one I spoke to was really keen to give me their wish lists and as I started to jot their ideas down, some similarities started to emerge, but for some their thoughts varied significantly.    Prioritise the must haves and rationalise the nice to haves and a vision of your new building will start to emerge.

TIP don’t lose those more obscure requests. Whilst on this occasion I couldn’t deliver a building that had an on-site wind turbine, I was able to deliver on the overhead gantry crane!

TIP:  to fulfil everyone’s requirements you would most likely need to commission a bespoke building, so make sure to manage expectations!

Internal Project Team

You can’t succeed on your own so it is imperative that you establish an internal project team.  Working with business managers from across the organisation proved a valuable source of knowledge and support.  Individual managers were allocated areas of responsibility spanning right across the project and each were tasked with identifying what needed to be done , this formed the basis of a project plan.

Example project areas:

·         Property

·         Fit out

·         Process/Systems

·         Health & Safety

·         Quality

·         Marketing

·         People

 

Ensuring the team communicated regularly weekly meetings were held and if on occasion some colleagues were unable to attend it ensured that we kept abreast of developments – or on occasion the lack of!

Select a property

It seems obvious, but finding the right property in the right location and that meets the detailed specification your colleagues have challenged you with can at times feel like finding a needle in a haystack. This is where the word compromise well and truly comes in to play!  Give yourself a sizeable geography in which to search for property – like you, everyone wants it all, so make sure you keep an open mind and research those properties that at first glance you would dismiss as not meeting your criteria.   What you think you need and what you finally agree is ‘the one’ may well prove to be completely different – it did for us!

TIP The more sites I visited the more ideas I collected as to what could work and might be achieved!

 TIP:  Draw up a short list of buildings and compare them to your must have list – is there a property that is starting to lead the way?

TIP:  Engage one of your project team to come with you to revisit your top properties – they will bring a new perspective to things.

TIPIf possible, establish a good relationship with the previous tenant, in our experience they were really helpful in providing information about the building, how it operated and its history!

The legal process can take quite some time, it was certainly longer than we had anticipated; but don’t underestimate this vital element of the journey. It is critically important that your future building has the correct legal foundations in place, so ensure you seek good advice.

With the legal aspects complete we gained possession of the building and we all got a much-needed motivation boost! The project team visited the site to design the layout and agree what renovations needed to be made.  The vision was taking shape!

Renovations and installations!

Be ready – This is an extremely busy period.  Obtaining quotes, liaising with contractors, arranging building services are just a handful of the tasks at hand. I found that having someone local to the site with good local knowledge is hugely helpful.  Access can be required at various times of the day and sometimes night but with the building not yet fully functional requires a lot of coming and goings to site.   Ensure the alarm systems are serviced and activated and site security implemented.

TIPTake your readings!  Ensure you capture the utility readings on day one and contact the associated providers to inform them you are the new tenants submitting the readings.  This should be a straightforward exercise I can assure you it isn’t, so be warned!

 

For those who may be undertaking a similar process either now or in the future, I wish you every success.  My recommendation is to ensure you appoint the right person to lead the project, a person who loves to do detail, enjoys multi-taking, doesn’t mind getting their hands (very) dirty, and has the patience of a saint and most importantly a good sense of humour!

BSRIA North is proud of what has been achieved and we forward to welcoming you through our doors – please visit us any time!

TRANSFORMATION OF THE OFFICE

 

 

 

 

 

 

 

Construction Leadership Council – study into labour markets & off-site

This blog was written by BSRIA Chief Executive Julia Evans

This blog was written by BSRIA Chief Executive Julia Evans

Exciting times: leading on from BSRIA’s press statement issued on 3rd February: the Construction Leadership Council (CLC) has been asked to undertake a “major” labour market study by skills minister Nick Boles MP and housing minister Brandon Lewis MP.

BSRIA is encouraging member and industry input from to the accompanying CLC consultationconstruction industry labour model study

Evidence to: construction.enquiries@bis.gsi.gov.uk

Deadline: Monday 29th February 2016.

The CLC has invited Mark Farmer of Cast Consultancy (formerly Arcadis) to lead the study, culminating in a report for CLC’s consideration in the spring. It will both: reflect on the impact of the current “labour model” in construction and make recommendations for action by the industry and government to help overcome constraints on skills development and the sector’s capacity to deliver new homes and infrastructure.

In particular, ministers want to know whether there are structural issues and risks that diminish long-term incentives for smaller subcontractors, who employ the largest part of the sectors workforce, to invest in training.

As I said earlier this month: BSRIA is very much supportive of this commission and consultation and, on behalf of the industry and our members, wishes to be involved every step of the way. Such commission hasn’t come a day too late, especially with rising demand especially, but not only, in the house building sector.

Alternative delivery methods – such as off-site – with a fresh skills base and capacity to bring new entrants to home building supply chains signifies a “shifting focus”.

 The consultation requests:

  • Evidence of how the construction labour model and recruitment practices impact on incentives for skills development in the sector (including in the supply chain) and on the introduction of more novel techniques such as off-site construction.

Evidence on how the current model works – including:

  • What business models and other arrangements could better support skills and skills pipelines in the sector?
  • What measures could improve wider incentives for capacity investment and the introduction of new ways of working?
  • What are the barriers and enablers to greater use of off-site construction?
  • How could the range of participants in the UK housing market be broadened, including through the better introduction of institutional funds?

So, I urge “one and all” to take a few minutes to put “comment to keyboard” for this crucial study. Remember: little can change without your expert opinions!