BSRIA and our approach to BIM

As part of an upcoming BIM blog series following on from the Open BIM REC webinar series BSRIA answered the following questions.

What has been the key to your success with BIM?

The key to a successful BIM project, based on our current experience, has been using a procurement method which promoted truly collaborative working.  It can be difficult when each party is employed against their own particular scope to ensure everyone works together.  One party may have to decide to do either what is best for the project or what they have been specifically employed to do – these are not always compatible.

How many BIM projects have you been involved in?

We have been involved in one project which has reached site which is trying to adopt BIM Level 2 throughout the project duration.  The project is currently on site and is due to complete in July 2017.

Where was your greatest BIM challenge to start with and what shortcuts are available now (if any) that were not available when you started on your BIM journey?

The greatest challenge was to convert the BIM Level 2 documents into working project processes.  There is a huge gap between the BS/PAS 1192 documents etc. and working project practices and procedures and the amount of effort involved to achieve this shouldn’t be underestimated.

The instances of useful and practical information and tools to enable BIM Level 2 requirements to be incorporated into real projects have not materialised. Some of the tools provided by the Government do not work in practice.  As a result, a more flexible approach to BIM Level 2 is being put in place.

How can industry ensure that clients receive the full benefits of BIM?

The best way for the industry to ensure that clients receive the full benefits of BIM is to listen to the client.  The industry is focussed on telling the client what they will get based on their own skills (often modelling skills rather than true BIM Level 2 capabilities), and too often they don’t look at how the client will use the information generated through the project in the operation of the asset once handed over.

What else can be done to help improve collaboration within the construction industry?

The best way to improve collaboration within the construction industry is to use a form of procurement which truly promotes collaborative working. We’ve been reviewing Integrated Project Insurance as one method and can see some real benefits.

To find out more about BSRIA’s BIM services and advice please visit our website. We also have a collection of BIM blogs by our BSRIA experts. 

The practicalities of classification in a BIM Level 2 environment

I first raised the issue of classification in the BSRIA blog back in March 2014 – my, how time flies.  As you would expect (or at least hope) things have moved on and there are some issues within the general world of classification which are worth raising, particularly in the context of BIM Level 2 with the UK Government’s mandate almost with us.

Current classification systems commonly used in construction typically work at ‘system’ level.  The highest level of classification is for a group of system types eg in CAWS (Common Arrangement of Work Sections).  This level is represented by a single letter: ‘S’ represents Piped Services, a category including systems such as Cold Water, Natural Gas, etc.

However, most classification systems available have an inherent flaw – they are not capable of classifying at a multi-services level, something that is common in the world of MEP.  In CAWS language, there needs to be a way of combining mechanical systems and electrical systems under a single heading, as the various mechanical systems are combined under the Piped Services ‘S’.

The success of information management depends heavily on the ability to retrieve a piece of information once generated.  BS 1192:2007+A1:2015 details a method for naming information files, and consists of a number of mandatory and optional fields.  The following extract from BS 1192 shows all the fields, together with their obligation – ‘Required’ or ‘Optional’.

John Sands Jan blog

Using this process would result in a file name (a similar process can be used for drawing numbers) as follows.  I have ignored the last two fields – Suitability and Revision – for the moment, and I’ll explain why later:

PROJ1-BSRIA-00-ZZ-RP-H-T31-00001

In this example, the CAWS classification system has been used, giving T31 for Low temperature hot water heating system.  And this is my point (finally, I hear you say) – the classification field is the only part of the file string which tells the recipient what the subject of the file is.  In future, when searching for information about a particular aspect of a project in the information repository, this classification code is the best way to identify relevant content.  Therefore, I feel it is vital that the classification field is used for all file names in order to make the information available for future use.  This reuse of information is where efficiency increases are realised and errors reduced by not having to reproduce information over and again.

Now, suppose that the report in the above example was the building services scheme design report, covering all mechanical, electrical and public health systems.  Which classification could be applied for that topic?  This takes us back to the point I made at the start of this article – for any classification system to work effectively it needs to be able to represent multi-services applications.

The classification system chosen for use in the UK Government Level 2 BIM requirements is Uniclass 2015, a development of Uniclass 2 which was produced by CPIC (Construction Projects Information Committee).  Uniclass 2015 has been prepared by NBS as part of an Innovate UK research competition won by their parent company RIBA Enterprises, and consists of a number of individual classification tables.   Although this is the classification system chosen to take us into Level 2 and beyond, it does not appear to be capable of meeting at least one fundamental requirement – the ability to deal with multi-services applications.

Don’t get me wrong.  This issue is not new and is certainly not confined to Unicalss 2015.  CAWS couldn’t handle multi-services classification either, but it was hoped that a new system, developed specifically for BIM, would provide the answer.  BSRIA has been raising this issue, both in its own name and as part of CIBSE initiatives, since Uniclass 2 was released.  Throughout the development of Uniclass 2015 we have raised a number of queries about the arrangement and capability of the format, but on this particular point we are still waiting for a meaningful response.

Whilst I’m at it, here’s another thing to think about.

As I mentioned earlier, the success of an information management system – for that’s what BIM is – is the ability to retrieve information once created.  The file naming convention described in BS 1192:2007+A1:2015 described above goes a long way in enabling this but there are some points of concern with its approach.

A document or file may be superseded a number of times in its life, and BS 1192 describes the process for moving that superseded file into the ‘Archive’ area of the information store.  This ensures that the complete history of the project is retained for future reference.  However, the way the successive versions are named is causing a little concern in practice as more people start to use these methods on live projects.  This is where those last two fields I conveniently ignored above come into play.

Historically, we have managed revised and superseded documents by using revision codes – in most cases a single letter after the final number (PROJ1-BSRIA-00-ZZ-RP-H-T31-00001A using the previous example).  This additional letter distinguishes each version of the same base document, and also has the added benefit of changing the file name to allow it to be saved whilst remaining recognisable.   The two remaining fields in the BS 1192 extract above appear to provide this facility within the BS 1192 approach.

However, the guide to BS 1192 (Building Information Management – A Standard Framework and Guide to BS 1192) states that:

Recommendation: status and revision should not be included as part of the file name as this will produce a new file each time those elements are updated, and an audit trail will not be maintained.

This doesn’t appear to be a very sensible approach to me.  You cannot save multiple versions of a file with the same name, so the addition of the revision letter to the file name is a simple and workable solution.  This might seem like a small or trivial issue in the big world of BIM, but it’s the sort of thing that could stop the widespread uptake of an otherwise very worthwhile file naming approach.

BSRIA has posted several blogs on the topic of BIM that can be read here.

Goodbye BIM… Hello digital

This blog was written by Ben Roberts, Associate and BIM Delivery Leader at Hoare Lea

This blog was written by Ben Roberts, Associate and BIM Delivery Leader at Hoare Lea

When BIM first reached the masses in about 2010 it was exciting: finally the construction industry wakes up to the 21st century and embraces the ability of computers to take on our more mundane tasks and improve communication! A data-centric approach to managing projects meant that appointments would be clearer, design computation could yield instant feedback, models would feed directly into fabrication robots and building operators could simply and efficiently access all the information about their assets at the click of a button.

However in 2015 there seems to be a wide spread consensus that BIM is just an expensive, less flexible way of delivering projects, and sadly the acronym is often a sure fire way of clearing a room.

So beyond the UK government’s level 2 BIM deadline in April 2016 there is no “level 3 BIM”; instead it is “digital built Britain”. And the industry is following suit; let’s remove this acronym with too much baggage and stigma and get down to what it really means: sensible data management, better quality communication of design intent, easier and more effective collaboration, and many opportunities to do things more quickly and accurately.

When thinking about “digital” rather than “BIM”, we find ourselves asking a more straight forward question: what can computers and data do for us?

Firstly, computers are capable of recording vast amounts of data and processing it very quickly, but to date they’re not so good at the more creative stuff; that’s what people are for. So it follows that we can “outsource” a lot of our thinking time to a processor by offloading the more mundane, repetitive tasks, leaving our creative minds to focus on the more interesting things. Good technology should allow people to spend less time alone staring at a computer!

As an example, BREEAM is a way of addressing a very important aspect of our building design (environmental impact) but is often seen as a time-consuming form filling exercise. This is a terribly boring thing for a human to do, but provides essential information in a usable common structure. This is exactly what computers are good at, so let’s automate this important but boring compliance process so that humans can get on with doing the interesting important tasks.

Ben Roberts blogWe are now also capable of doing things that were previously impossible or impractical. Virtual reality and augmented reality are now becoming cheaper and easier; anyone with a smartphone has a choice of free apps to upload your 3D models, and if oculus rift is outside your budget, try google cardboard for just £6! The MX3D Amsterdam bridge project is proving that 3D printing is not just for small objects; perhaps entire pipework systems could be printed on site too? Many other emerging technologies are presenting completely new options: reality capture, the internet of things, cloud computing, wearable technology and visual scripting are just a few examples.

Secondly, data can be very informative if you know what to do with it. Buildings can potentially generate enormous amounts of data, and in the right hands that can quickly be used to assess energy performance, make comparisons of different technologies, or identify faults in building systems, for example.  Raw data is daunting, but visualisation of that data is easy and provides a more immediate form of interpretation. As 2 examples, graphs and infographics are clear methods of showing key statistics and are easily generated in Excel, and 3D models give an intuitive interface to accessing associated data at various stages in a project lifecycle.

Finally, you don’t have to be a computer scientist to use a computer these days – my grandad is 95 years old and controls his heating remotely using his iPad. Much of the software available for design, construction and operation of buildings is going this way too. Virtual reality is a good starting point for the technologically averse, but there are plenty of other technologies that offer simple solutions for anyone.

So I encourage you all, upon hearing the acronym “BIM”, not to run for the hills but to simply consider what computers and data can do to help you.

Ben is a chartered mechanical engineer and holds the position of BIM Delivery Leader for Hoare Lea, a role which involves pushing the boundaries of software tools and enabling teams to deliver BIM projects as efficiently and effectively as possible around the practice in the UK and Middle East. He specialises in using BIM models for design calculations. Ben is an active member of the CIBSE BIM steering group, the BSRIA BIM Network, and is involved in developing many industry standards for MEP BIM delivery. He has written articles for a variety of construction industry journals on the subject of BIM, and regularly presents and lectures on the subject around the world.